

5TE4822 LED pushbutton,1NO,red,long lead
Код товара: 508066
2470,50 грн з ПДВ
Pushbutton, 1NO 20 A, 1 button red, LED 230 V for long supply cable
| Виробник |
|---|
button, 1 NO 20 A 1 key red, Lamp 230 V for long supply lines Switching devices for mounting onto standard rails for controlling electrical systems. The switchgears from Siemens for standard rail mounting are an important elements of SENTRON components for electrical installations and are used in control cabinets and distribution boards for switching small loads on/off or over. Whether with remote or manual switching, latch or touch function, and for infrastructure or industrial requirements, Siemens provides switchgears for all applications and every application area. User-friendly mounting and connection technology, standardized accessories and an integrated design are the key features of this device family. The Siemens switching devices are primarily characterized by: 1. Comprehensive applications for switching small loads. 2. A wide variety of standardized accessories, easy to install and replaceable at any time. 3. Space-saving and easy mounting onto standard mounting rails. 4. Combination with remote control switches possible. 5. Reliable safety during installation due to standard reach-around and touch protection. 6. Optimized technology for your safety – only from Siemens.
International product number (GTIN): 4001869209814
Universal product code (UPC):
Alternative product number: 5TE4822
Product ID of the manufacturer: 5TE4822
Manufacturer type description: LED pushbutton,1NO,red,long lead
Ключові слова: Pulse button, Push button for distribution board, Push button, complete, Pushbutton, Push button, Push button switch, Button, Illuminated switch, Start/stop switch, Pushbutton modular
Special product status:
Classification system: ETIM-8.0
Group reference: EC001546
Посилання
Страница продукта
Link to FAQ
Link to Application example
Link to Download
Link to Technical data sheet
Link to Sales brochure
Link to REACH information
Link to Product page
Dimensioned drawing
Link to Product note
Link to Siemens support portal
Circuit diagram



